Next: Cleaning of substrates and
Up: Materials & films preparation
Previous: Materials & films preparation
Bulk material synthesis
The bulk sample was prepared by direct synthesis from pure
elements (i.e. As and S). Calculated amounts of the elements in
required ratio was put into a specially washed quartz ampoule,
vacuum outgassed for several hours to pressure
Pa and
finally sealed. The total sample mass in the ampoule was 12 g. The
sample was melted in a rocking furnace (usually 700-800
C) for 24 h and then quenched rapidly in cold water to
room temperature.(20
C)
root
2002-05-23